5-Room Basic BTO (Standard Flat) Renovation Package - Style Rider
  • 5,283 Satisfied Homeowners!

    We design and renovate homes with transparent pricing

  • 5,283 Satisfied Homeowners!

    We design and renovate homes with transparent pricing

  • 5,283 Satisfied Homeowners!

    We design and renovate homes with transparent pricing

    Monochrome Home

HDB 5-ROOM BTO (Standard flat) Package

HDB 5-Room – Basic BTO (Standard Flat)

Chinese New Year Package – Limited sets available!

20% Discount | $3850 savings

$15,400

Usual Price : $19,250

What’s included in this package?

A: Design works 

  • Design consultation & space planning
  • Design proposal & 3D perspective drawing
  • Selection of colour, material & accessories
  • Consultant & project management
  • Site inspection/work schedule

B: Masonry works 

  • Supply labour & materials to lay 60cm x 60cm polished homogeneous tiles c/w matching tiles skirting for 2/3 bedrooms
  • Supply labour & materials to construct 1 set H2” thick kitchen cabinet base c/w tiles skirting
  • Supply labour & materials to construct 1 set H2” thick fridge base c/w tiles finishing
  • Supply labour & materials to construct 1 set H2” thick washing machine base c/w tiles finishing
  • Supply labour & materials to construct 1 no. shower kerb for each bathroom

C: Carpentry works (Laminates @$55 each)

Design & fabricate L20ft kitchen cabinets c/w:

  • Laminated finish, white internal PVC & ABS Trimming on doors / drawer heads
  • Soft closing door hinges
  • 1 vertical row of drawers using drawer runner with ball bearing system
  • 1 no. Frosted glass c/w wooden frame & 1 set of basic hydraulic pump
  • 1 set of acrylic cutlery tray

D: Painting works

Supply labour & materials to paint all interior walls & ceiling with NIPPON Vinilex 5000 paint (4+1 colors)

E: Plumbing works (Non-concealed cold water points only)

Supply labour to run new inlet/outlet piping for 1 kitchen sink & 1 washing machine

Supply labour only to install:

  • 1 no. Kitchen sink & tap
  • 1 no. Washing machine tap
  • 2 sets of bathroom accessories

E: Miscellaneous works 

  • Provide floor protection using corrugated cardboard prior to commencement of renovation works
  • Provide 1 trip chemical wash for newly tiled up areas upon completion of renovation works
  • Provide 1 trip general cleaning for interior unit only upon completion of renovation works
  • Haulage & debris fee